Rock Farm, Shropshire

Project Details


In August 2025 Enviromena completed a multi-million pound transaction to acquire the 40MW (AC) Rock Farm Solar Farm project in Ludlow, Shropshire. It is due to be energised in Q3 2026.

LOCATION:Telford, Shropshire
POWER CAPACITY:40 MW (AC) Solar and 12MW Battery Energy Storage
STATUS:Pre-construction
MODULES:TBC
NUMBER OF MODULES INSTALLED:TBC
INVERTERS:TBC
NUMBER OF INVERTERS INSTALLED:TBC
CONNECTION VOLTAGE:33kV
ENERGISATION DATE:Forecast Q3 2026

What was involved

Enviromena acquired the Rock Farm solar project near Ludlow, Shropshire in August 2025 from Anglo Renewables. The acquisition was handled by Enviromena’s experienced in-house legal team over a 4-month period.

Once constructed the project is forecasted to generate 47,410 MWh per annum and that will save more than 8,250 tonnes of CO2 per annum.

The site will deliver lasting environmental enhancements, including the planting of new trees, hedgerows and wildflower meadows. Together, these measures will ensure the solar farm supports local wildlife and integrates sensitively with the surrounding countryside.

In addition to the project’s strong environmental credentials, the scheme will also directly support initiatives in the local area via a community benefit fund which has been agreed with the local community.

Contract for Difference

Rock Farm is a ready-to-build project which was awarded a government-backed Contract for Difference (CfD) in allocation round 6, which provides an indexed-linked revenue stream for 15 years, and crucially protects the forecast grid connection date from the ongoing grid reforms.

Construction

Construction is due to commence in late 2025 and energisation is forecasted to take place in Q3 2026.

Management of the site

Enviromena will own and operate the site utilising the expertise of our in-house O&M and asset management teams. This includes the team carrying out performance monitoring, security monitoring, preventative / reactive maintenance, landscape management all while ensuring safety is maintained.

Project timeline


*0.17489 kg per kWh (GOV.UK – 2025)

**2,700kWh per annum – average sized UK home (Ofgem)

Active Projects

A selection of Enviromena projects and case studies

Meeting Global Power Demands

Find out how Enviromena can deliver safe, affordable and reliable clean energy solutions, driving us towards a cleaner future.